Skip to content

Electrical · Pre Build Electrical

Pre build electrical, planned before the walls close.

Construction stage electrical. Rough ins, conduit and wiring pathways are installed and coordinated with mechanical and plumbing before drywall goes up.

Pre Build Electrical inquiry

Tell us about the project and the Shiyana team will follow up.

Fields marked with an asterisk are required.

Your details are used only to respond to this inquiry. See our privacy notice.

Category
Electrical
Location
Guelph, Ontario
Steel stud framing during the build out of a commercial office in Mississauga, before the walls are closed

01Overview

Construction stage electrical.

The cheapest time to get electrical right is before drywall. Once walls and ceilings close, every missed box, conduit run or circuit becomes a repair.

Pre build electrical covers the construction stage. We review the drawings and equipment requirements, set out conduit and boxes during framing, and complete rough ins in step with the other services.

02Scope

Pre build electrical scope

  1. 01

    Pre build electrical planning

    Drawings and equipment requirements reviewed so the electrical is planned before work starts.

  2. 02

    Electrical rough ins

    Boxes, conduit and cable installed in sequence with framing and the other services.

  3. 03

    Conduit

    Conduit runs laid out around structure, ductwork and plumbing.

  4. 04

    Wiring pathways

    Pathways set for power, lighting and equipment ahead of close in.

  5. 05

    Equipment requirements

    Power needs for mechanical equipment, commercial kitchens and chargers identified early.

  6. 06

    Electrical infrastructure for development projects

    The main electrical routes of a development planned with the structure and the other services.

Scope is confirmed project by project after review.

03On site

Working around
the other trades.

Electrical routes are laid out against the mechanical and plumbing routes, so the three trades share the building without clashing.

Questions

Common questions

When should pre build electrical be involved?

As early as possible. Ideally while drawings and schedules are still being finalised and before framing is closed.

Related capabilities

Related projects

All projects
Steel stud framing during the build out of a commercial office in Mississauga, before the walls are closed07

Commercial Offices

Commercial Office

Office · Commercial Interior · Mississauga, Ontario

Open basement ceiling with ductwork and services during a legal basement conversion in Toronto10

Basement · Residential

Toronto, Ontario

Planning a project?
Let's talk about the trades.

Share the location, stage and drawings if you have them. The inquiry form at the top of this page already has this service selected.

Discuss Your Project