07Electrical · Pre Build Electrical
Pre build electrical, planned before the walls close.
Construction stage electrical. Rough ins, conduit and wiring pathways are installed and coordinated with mechanical and plumbing before drywall goes up.
- Category
- Electrical
- Location
- Guelph, Ontario

01Overview
Construction stage electrical.
The cheapest time to get electrical right is before drywall. Once walls and ceilings close, every missed box, conduit run or circuit becomes a repair.
Pre build electrical covers the construction stage. We review the drawings and equipment requirements, set out conduit and boxes during framing, and complete rough ins in step with the other services.
02Scope
Pre build electrical scope
01
Pre build electrical planning
Drawings and equipment requirements reviewed so the electrical is planned before work starts.
02
Electrical rough ins
Boxes, conduit and cable installed in sequence with framing and the other services.
03
Conduit
Conduit runs laid out around structure, ductwork and plumbing.
04
Wiring pathways
Pathways set for power, lighting and equipment ahead of close in.
05
Equipment requirements
Power needs for mechanical equipment, commercial kitchens and chargers identified early.
06
Electrical infrastructure for development projects
The main electrical routes of a development planned with the structure and the other services.
Scope is confirmed project by project after review.
03On site
Working around
the other trades.
Electrical routes are laid out against the mechanical and plumbing routes, so the three trades share the building without clashing.
Questions
Common questions
When should pre build electrical be involved?
As early as possible. Ideally while drawings and schedules are still being finalised and before framing is closed.
Planning a project?
Let's talk about the trades.
Share the location, stage and drawings if you have them. The inquiry form at the top of this page already has this service selected.